This site required a full refit, that included the planning for a total change of layout. Building work took place to increase the size of the shopfloor and storage areas and we insured all building control requirements were met. The refit was completed with a new shopfront, all new flooring, lighting, FTG area, counters, refrigeration and fixtures.